4.2 - Engineering Controls
- Preventive Maintenance
4.4 - Housekeeping
- Storage, Transportation, Handling of Bags
- Prevention of Spillage/Spread of Contamination
- Investigate
- Eliminate or Reduce Spillage
- Make Cleaning Easier
- Cleaning Techniques and Procedures
- Equipment and Techniques
- Asbestos Waste
- Procedure
- Responsibility for Cleaning
- Cleaning Schedules
4.5 - Personal Protective Devices
Figure 1 - Schematic Diagram of a Basic Local Ventilation System
Figure 2 - A Bag Opening Station
Figure 3 - Conveyor Enclosure for Conveyor Belt Dumping or Transfer
Figure 4 - Enclosure for Textile Carding Machine
Figure 5 - Static Pressure Reading Form
Figure 6 - Bags Inspection
Figure 7 - Dust Collectors Inspection Sheet
Figure 8 - Technique for Illuminating a Dust Cloud With a Tyndall Beam
Figure 9 - History of Dust Control at an Asbestos-Cement Plant